What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 66 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £249.67 |
| 2 | Pembroke 41 | £218.62 |
| 3 | GridBeyond L0DN | £125.31 |
| 4 | West Burton B | £122.22 |
| 5 | Carrington Ltd - 2 | £119.08 |
| 6 | Native River | £107.89 |
| 7 | Tebworth Park | £107.55 |
| Region | £/MWh |
|---|---|
| East Midlands | £122.2 |
| South Western | £107.9 |
| Eastern | £107.5 |