What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 57 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £112.50 |
| 2 | Dong Severn Ut 10 | £101.41 |
| 3 | Dong Severn Ut 20 | £101.41 |
| 4 | GridBeyond L0EN | £100.45 |
| 5 | GridBeyond L0DN | £100.44 |
| 6 | Unit 2 | £93.21 |
| 7 | BGI Trading #1 | £83.12 |
| Region | £/MWh |
|---|---|
| North Western | £83.1 |
| Yorkshire | £75.8 |
| Eastern | £73.3 |
| South Scotland | £71.7 |