What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 63 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £122.87 |
| 2 | Dong Severn Ut 10 | £122.87 |
| 3 | GridBeyond L0EN | £121.71 |
| 4 | Limejump Energy #02 | £89.57 |
| 5 | Ferrybridge-1 | £88.31 |
| 6 | Halesworth | £87.25 |
| 7 | Hawthorn Pit | £85.48 |