What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 90 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £169.95 |
| 2 | GridBeyond L0EN | £168.33 |
| 3 | Centrica Business Solutions S05L | £136.01 |
| 4 | UKPR East Mids | £131.97 |
| 5 | UKPR S East | £131.96 |
| 6 | UKPR MANW | £131.96 |
| 7 | Brigg DG | £127.92 |
| Region | £/MWh |
|---|---|
| Eastern | £127.9 |
| North Western | £127.0 |
| Yorkshire | £124.1 |