What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Monk Fryston | £5.28 |
| 2 | Lakeside | £5.18 |
| 3 | Dong Severn Ut 20 | £5.17 |
| 4 | Dong Severn Ut 10 | £5.17 |
| 5 | Ocker Hill | £4.76 |
| 6 | GridBeyond L0EN | £4.74 |
| 7 | Flatworth | £4.49 |
| Region | £/MWh |
|---|---|
| Yorkshire | £5.2 |
| Midlands | £4.8 |
| Northern | £4.5 |
| North Western | £4.4 |
| South Eastern | £3.7 |
| Southern | £3.5 |