What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 65 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-2 | £229.50 |
| 2 | Ferrybridge-1 | £214.96 |
| 3 | SSE Energy Supply #01 | £196.40 |
| 4 | Hutton | £134.17 |
| 5 | Broadditch | £119.43 |
| 6 | Wormald Green | £110.52 |
| 7 | THURROCK STORAGE #1 | £110.29 |
| Region | £/MWh |
|---|---|
| Yorkshire | £219.9 |
| Eastern | £134.2 |
| South Eastern | £111.0 |
| Northern | £110.5 |