What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Holes Bay | £19.00 |
| 2 | Lakeside | £19.00 |
| 3 | Ocker Hill | £19.00 |
| 4 | Monk Fryston | £19.00 |
| 5 | Fordtown | £19.00 |
| 6 | Braco | £19.00 |
| 7 | Orchardbank | £19.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £19.0 |
| North Scotland | £19.0 |
| Southern | £19.0 |
| Midlands | £19.0 |