What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £38.75 |
| 2 | Keadby-2 Main | £31.89 |
| 3 | Pembroke 41 | £26.00 |
| 4 | West Burton B 3 | £15.90 |
| 5 | Native River | £15.38 |
| 6 | Tebworth Park | £15.21 |
| 7 | Brigg | £13.36 |
| Region | £/MWh |
|---|---|
| South Western | £15.4 |
| Eastern | £15.2 |
| Yorkshire | £12.5 |
| Midlands | £11.0 |
| North Western | £10.8 |
| South Eastern | £10.8 |