What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 100 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 4 | £501.10 |
| 2 | Skelmersdale | £376.50 |
| 3 | Farnham | £362.00 |
| 4 | Chapel Farm | £361.64 |
| 5 | UKPR MANW | £358.02 |
| 6 | Thame Road | £357.12 |
| 7 | SSE Energy Supply #01 | £355.04 |
| Region | £/MWh |
|---|---|
| Eastern | £357.7 |
| North Western | £356.2 |
| Southern | £348.8 |
| South Wales | £318.4 |