What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 61 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Contego | £5.54 |
| 2 | Bulphan Fen | £5.16 |
| 3 | Ferrybridge-1 | £5.09 |
| 4 | Hutton | £4.88 |
| 5 | SUNDON | £4.77 |
| 6 | Buxton | £4.76 |
| 7 | Carrington Ltd - 2 | £4.64 |
| Region | £/MWh |
|---|---|
| South Eastern | £5.5 |
| North Western | £4.8 |
| Eastern | £4.7 |
| South Western | £3.8 |