What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 141 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £36.87 |
| 2 | Staythorpe 3 | £33.70 |
| 3 | Unit 2 | £30.21 |
| 4 | Unit 1 | £30.13 |
| 5 | Unit 3 | £30.05 |
| 6 | Carrington Ltd - 2 | £29.58 |
| 7 | Little Barford main 1 | £29.26 |
| Region | £/MWh |
|---|---|
| Yorkshire | £19.6 |