What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 64 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £259.50 |
| 2 | GridBeyond L0DN | £67.35 |
| 3 | GridBeyond L0EN | £67.35 |
| 4 | Tye Lane | £37.00 |
| 5 | EDFE Aggregate N Scot 1 | £35.75 |
| 6 | ZENOBE BLACKHILLOCK #1 | £35.74 |
| 7 | ZENOBE BLACKHILLOCK #2 | £35.73 |
| Region | £/MWh |
|---|---|
| Eastern | £36.6 |
| North Scotland | £34.0 |
| South Scotland | £27.8 |
| Yorkshire | £26.8 |
| South Western | £25.3 |
| Midlands | £19.5 |