What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £41.00 |
| 2 | Staythorpe 4 | £36.38 |
| 3 | Didcot B main 5 | £35.20 |
| 4 | Dong Severn Ut 10 | £32.34 |
| 5 | SOUTH HUMBER BANK P/S | £26.69 |
| 6 | Unit 1 | £19.48 |
| 7 | Octopus Energy #01 | £18.88 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £15.1 |
| South Western | £14.2 |
| Eastern | £13.3 |
| Southern | £13.1 |
| Midlands | £13.0 |