What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 84 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £44.70 |
| 2 | Drax | £37.05 |
| 3 | GridBeyond L0DN | £21.74 |
| 4 | GridBeyond L0EN | £21.74 |
| 5 | UKPR S East | £19.42 |
| 6 | SUNDON | £18.25 |
| 7 | Larks Green | £18.25 |
| Region | £/MWh |
|---|---|
| Eastern | £18.3 |
| South Western | £18.3 |