What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £27.90 |
| 2 | Lakeside | £14.21 |
| 3 | Ocker Hill | £13.79 |
| 4 | Dollymans | £11.42 |
| 5 | Centrica Business Solutions S05L | £11.40 |
| 6 | Enfield Centre Ltd BMU1 | £9.32 |
| 7 | THURROCK STORAGE #3 | £9.17 |
| Region | £/MWh |
|---|---|
| Yorkshire | £14.2 |
| Midlands | £13.8 |
| Eastern | £11.4 |
| South Eastern | £9.2 |