What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-2 | £7.03 |
| 2 | Bulphan Fen | £6.64 |
| 3 | SUNDON | £6.16 |
| 4 | Tye Lane | £5.80 |
| 5 | BREDBURY | £5.78 |
| 6 | EDF Aggregated Unit 05 | £5.48 |
| 7 | EDFE Aggregate S Eng 02 | £5.21 |
| Region | £/MWh |
|---|---|
| Eastern | £6.1 |
| North Western | £5.8 |
| Midlands | £4.9 |