What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 41 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £58.33 |
| 2 | West Burton B 1 | £43.71 |
| 3 | GridBeyond L0DN | £37.50 |
| 4 | GridBeyond L0EN | £37.50 |
| 5 | Marchwood | £37.29 |
| 6 | BMUid for Sutton Bridge | £35.68 |
| 7 | Connah's Quay | £34.08 |
| Region | £/MWh |
|---|---|
| Eastern | £26.9 |
| North Western | £23.7 |
| North Scotland | £23.0 |
| Merseyside and North Wales | £21.4 |
| Northern | £21.2 |
| South Western | £20.8 |