What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 62 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Hutton | £702.25 |
| 2 | Limejump Energy #04 | £662.47 |
| 3 | Richborough Park 1 | £610.25 |
| 4 | Pillswood 1 | £558.50 |
| Region | £/MWh |
|---|---|
| Eastern | £702.3 |
| South Eastern | £610.3 |
| Yorkshire | £558.5 |