What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 65 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £27.28 |
| 2 | Staythorpe 1 | £25.50 |
| 3 | Staythorpe 4 | £24.43 |
| 4 | Staythorpe 2 | £21.26 |
| 5 | GridBeyond L0DN | £18.43 |
| 6 | GridBeyond L0EN | £18.43 |
| 7 | Spalding | £17.00 |
| Region | £/MWh |
|---|---|
| South Scotland | £10.3 |