What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 56 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £23.74 |
| 2 | Staythorpe 3 | £22.25 |
| 3 | Staythorpe 2 | £21.33 |
| 4 | GridBeyond L0DN | £16.32 |
| 5 | GridBeyond L0EN | £16.32 |
| 6 | Spalding | £14.73 |
| 7 | Rocksavage | £13.63 |
| Region | £/MWh |
|---|---|
| North Western | £6.9 |
| Eastern | £6.8 |
| Midlands | £5.8 |
| East Midlands | £5.0 |
| Northern | £4.9 |
| Merseyside and North Wales | £4.9 |
| South Western | £4.0 |