What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £8.22 |
| 2 | Keadby-2 Main | £4.71 |
| 3 | Jamesfield 2 | £3.25 |
| 4 | Skelmersdale | £2.56 |
| 5 | Dong Severn Ut 10 | £2.52 |
| 6 | Little Raith | £2.50 |
| 7 | GridBeyond L0EN | £2.42 |
| Region | £/MWh |
|---|---|
| North Scotland | £3.3 |
| North Western | £2.6 |
| Eastern | £2.3 |
| Southern | £2.1 |
| South Scotland | £1.7 |