What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Drax | £10.56 |
| 2 | Keadby-2 Main | £10.21 |
| 3 | Bloxwich | £9.65 |
| 4 | UKPR S East | £8.17 |
| 5 | Capenhurst | £8.00 |
| 6 | Centrica Business Solutions S05L | £7.74 |
| 7 | UK Power Reserve #08 | £7.50 |
| Region | £/MWh |
|---|---|
| Eastern | £6.1 |
| South Eastern | £5.5 |
| Merseyside and North Wales | £5.1 |
| Midlands | £5.0 |
| North Western | £4.9 |
| South Wales | £4.5 |
| Southern | £4.4 |