What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pillswood 1 | £6.00 |
| 2 | Oldham | £6.00 |
| 3 | Capenhurst | £6.00 |
| 4 | SSE Energy Supply #01 | £5.96 |
| 5 | Ferrybridge-2 | £5.91 |
| 6 | Whitebirk | £5.91 |
| 7 | Drax | £5.71 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £6.0 |
| Yorkshire | £6.0 |
| Eastern | £5.5 |
| North Western | £5.2 |
| South Wales | £5.0 |
| South Western | £4.6 |
| Midlands | £4.2 |