What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £17.38 |
| 2 | Staythorpe 2 | £15.60 |
| 3 | Staythorpe 3 | £15.60 |
| 4 | Bulphan Fen | £9.30 |
| 5 | Flatworth | £8.75 |
| 6 | GridBeyond L0DN | £8.47 |
| 7 | GridBeyond L0EN | £8.47 |
| Region | £/MWh |
|---|---|
| Eastern | £9.3 |
| Northern | £8.8 |
| East Midlands | £8.2 |
| Midlands | £8.2 |
| South Eastern | £8.2 |
| South Scotland | £8.2 |
| Southern | £8.2 |