What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £18.00 |
| 2 | Staythorpe 1 | £15.60 |
| 3 | Staythorpe 4 | £13.20 |
| 4 | BMUid for Sutton Bridge | £7.12 |
| 5 | GridBeyond L0DN | £5.96 |
| 6 | GridBeyond L0EN | £5.96 |
| 7 | Chapel Farm | £4.55 |
| Region | £/MWh |
|---|---|
| South Western | £4.5 |
| Eastern | £3.5 |
| North Western | £3.1 |
| Midlands | £3.1 |
| South Scotland | £3.1 |
| Southern | £3.0 |