What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £5.00 |
| 2 | Staythorpe 4 | £4.07 |
| 3 | GridBeyond L0DN | £1.50 |
| 4 | GridBeyond L0EN | £1.50 |
| 5 | HawkersHill | £1.06 |
| 6 | Dinorwig | £0.85 |
| 7 | Blackpool | £0.64 |
| Region | £/MWh |
|---|---|
| Southern | £1.1 |
| South Western | £0.6 |
| Eastern | £0.5 |