What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ocker Hill | £86.76 |
| 2 | Lakeside | £86.76 |
| 3 | Hutton | £82.03 |
| 4 | THURROCK STORAGE #2 | £79.79 |
| 5 | THURROCK STORAGE #3 | £79.58 |
| Region | £/MWh |
|---|---|
| Midlands | £86.8 |
| Yorkshire | £86.8 |
| Eastern | £82.0 |
| South Eastern | £79.7 |