What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 31 | £2325.00 |
| 2 | Shoreham | £2248.43 |
| 3 | Unit 2 | £2107.72 |
| 4 | Statkraft Markets #4 | £1792.47 |
| 5 | Tebworth Park | £1446.33 |
| 6 | Sizing John | £1418.64 |
| 7 | Pillswood 2 | £1297.29 |
| Region | £/MWh |
|---|---|
| Eastern | £1281.1 |
| Yorkshire | £1040.4 |
| Northern | £973.5 |
| Merseyside and North Wales | £908.5 |
| South Wales | £825.4 |
| North Western | £705.0 |