What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-2 | £94.82 |
| 2 | SSE Energy Supply #01 | £68.59 |
| 3 | Keadby-2 Main | £54.70 |
| 4 | Dollymans | £52.03 |
| 5 | Statkraft Markets #08 | £42.06 |
| 6 | Marchwood | £37.47 |
| Region | £/MWh |
|---|---|
| Eastern | £52.0 |