What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £8.81 |
| 2 | BMUid for Sutton Bridge | £7.81 |
| 3 | Ferrybridge-2 | £7.69 |
| 4 | Ferrybridge-1 | £6.73 |
| 5 | Spalding | £6.68 |
| 6 | SSE Energy Supply #01 | £6.25 |
| 7 | Dollymans | £6.00 |
| Region | £/MWh |
|---|---|
| Eastern | £6.0 |