What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £10.70 |
| 2 | Monk Fryston | £10.30 |
| 3 | Tebworth Park | £5.39 |
| 4 | Sizing John | £5.14 |
| 5 | F & S Energy #03 | £4.89 |
| 6 | Wormald Green | £4.87 |
| 7 | Flexitricity #01 | £4.80 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.5 |
| Northern | £4.9 |
| Eastern | £4.0 |
| South Eastern | £3.8 |
| Midlands | £3.6 |