What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £579.41 |
| 2 | Spalding | £561.35 |
| 3 | Staythorpe 1 | £531.39 |
| 4 | Ferrybridge-2 | £517.88 |
| 5 | Dollymans | £502.80 |
| 6 | Marchwood | £462.71 |
| 7 | Staythorpe 4 | £457.01 |
| Region | £/MWh |
|---|---|
| Eastern | £502.8 |