What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £11.97 |
| 2 | Grain | £11.97 |
| 3 | Carrington Ltd - 2 | £11.21 |
| 4 | Unit 2 | £10.93 |
| 5 | Monk Fryston | £7.24 |
| 6 | THURROCK STORAGE #3 | £6.89 |
| 7 | THURROCK STORAGE #1 | £6.88 |
| Region | £/MWh |
|---|---|
| Yorkshire | £7.2 |
| South Eastern | £6.9 |
| Midlands | £6.4 |
| Southern | £6.1 |