What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dinorwig | £56.47 |
| 2 | Immingham CHP | £36.93 |
| 3 | Centrica Business Solutions S05L | £34.48 |
| 4 | Sizing John | £30.22 |
| 5 | THURROCK STORAGE #1 | £30.04 |
| 6 | Swangate | £26.34 |
| 7 | Coryton | £25.90 |
| Region | £/MWh |
|---|---|
| Eastern | £30.2 |
| South Eastern | £30.0 |
| Yorkshire | £26.3 |