What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Rothes Bio-Plant CHP1 | £508.31 |
| 2 | Tye Lane | £467.83 |
| 3 | Brook Farm | £450.00 |
| 4 | EDF Aggregated Unit 05 | £441.48 |
| 5 | Nursling | £425.35 |