What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 56 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £16.69 |
| 2 | Tye Lane | £14.47 |
| 3 | SUNDON | £13.83 |
| 4 | Larks Green | £12.03 |
| 5 | EDFE Aggregate S Eng 02 | £11.44 |
| Region | £/MWh |
|---|---|
| Yorkshire | £16.7 |
| Eastern | £14.1 |
| South Western | £12.0 |