What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 1 | £20.72 |
| 2 | Shoreham | £19.06 |
| 3 | Unit 2 | £17.75 |
| 4 | Brigg | £15.25 |
| 5 | Enfield Centre Ltd BMU1 | £14.76 |
| 6 | Grain | £14.76 |
| 7 | SOUTH HUMBER BANK P/S | £13.52 |
| Region | £/MWh |
|---|---|
| North Western | £11.3 |
| Yorkshire | £10.3 |
| Eastern | £10.1 |
| Midlands | £10.0 |