What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Buxton | £76.50 |
| 2 | Cottam Development Centre | £75.08 |
| 3 | Enfield Centre Ltd BMU1 | £75.08 |
| 4 | Medway | £74.40 |
| 5 | Arbroath | £57.00 |
| 6 | Coupar | £53.86 |
| 7 | ZENOBE BLACKHILLOCK #2 | £51.63 |
| Region | £/MWh |
|---|---|
| North Western | £76.5 |
| South Scotland | £50.3 |
| North Scotland | £50.2 |
| South Western | £49.3 |
| Yorkshire | £44.6 |
| Northern | £42.0 |
| Merseyside and North Wales | £40.2 |
| Eastern | £39.3 |
| Midlands | £34.2 |