What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £14.16 |
| 2 | Connah's Quay | £12.74 |
| 3 | Flexitricity #02 | £5.19 |
| 4 | Exergy Solutions E00E | £2.63 |
| Region | £/MWh |
|---|---|
| Eastern | £0.0 |