What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Langage | £518.00 |
| 2 | Shoreham | £366.00 |
| 3 | Dong Severn Ut 10 | £196.89 |
| 4 | Chapel Farm | £87.16 |
| 5 | Ilmer Lane | £87.16 |
| 6 | Thame Road | £87.16 |
| 7 | Contego | £71.84 |
| Region | £/MWh |
|---|---|
| South Eastern | £71.8 |
| Eastern | £62.8 |
| Southern | £47.2 |