What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S06B | £2.36 |
| 2 | Lakeside | £2.02 |
| 3 | Keadby-2 Main | £1.89 |
| 4 | Grain | £1.68 |
| 5 | Exergy Solutions E00E | £1.44 |
| 6 | Shoreham | £1.28 |
| 7 | Farnham | £1.06 |