What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 6 | £11.73 |
| 2 | Exergy Solutions E00E | £10.94 |
| 3 | Cottam Development Centre | £10.75 |
| 4 | Connah's Quay | £9.97 |
| 5 | Lakeside | £8.94 |
| 6 | Brigg | £8.93 |
| 7 | THURROCK STORAGE #1 | £8.76 |
| Region | £/MWh |
|---|---|
| South Eastern | £8.8 |
| Yorkshire | £8.3 |
| Eastern | £6.7 |
| North Western | £6.0 |