What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 46 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £37.36 |
| 2 | Kings Lynn A | £37.03 |
| 3 | Ocker Hill | £34.45 |
| 4 | THURROCK STORAGE #1 | £33.50 |
| 5 | THURROCK STORAGE #3 | £33.25 |
| 6 | UKPR S East | £33.00 |
| 7 | UKPR MANW | £32.08 |
| Region | £/MWh |
|---|---|
| Yorkshire | £34.2 |
| South Eastern | £33.3 |
| Midlands | £31.1 |
| Eastern | £28.7 |
| South Western | £24.3 |