What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 2 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £22.15 |
| 2 | Centrica Business Solutions S05L | £14.41 |
| 3 | THURROCK STORAGE #1 | £8.23 |
| 4 | Dong Severn Ut 10 | £5.25 |
| 5 | Unit 3 | £1.99 |
| 6 | Langage | £0.90 |
| 7 | Sizing John | £0.65 |
| Region | £/MWh |
|---|---|
| South Eastern | £8.2 |
| Eastern | £0.7 |