What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £19.33 |
| 2 | THURROCK STORAGE #1 | £13.61 |
| 3 | Ocker Hill | £9.00 |
| 4 | Dong Severn Ut 10 | £8.86 |
| 5 | Sizing John | £7.78 |
| 6 | Langage | £7.00 |
| 7 | Cottam Development Centre | £6.86 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.6 |
| Midlands | £9.0 |
| Eastern | £7.8 |