What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 2 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £19.81 |
| 2 | Centrica Business Solutions S05L | £12.50 |
| 3 | Lakeside | £6.54 |
| 4 | Ocker Hill | £4.35 |
| 5 | Dong Severn Ut 10 | £4.13 |
| 6 | SSE Energy Supply #01 | £2.73 |
| 7 | ClayTye Farm 2 | £2.25 |
| Region | £/MWh |
|---|---|
| Yorkshire | £6.5 |
| Midlands | £4.3 |
| Eastern | £2.3 |
| South Eastern | £1.8 |
| Northern | £0.2 |
| North Western | £0.2 |