What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £15.25 |
| 2 | THURROCK STORAGE #1 | £7.76 |
| 3 | Keadby-2 Main | £5.89 |
| 4 | Cottam Development Centre | £5.16 |
| 5 | Unit 3 | £5.14 |
| 6 | Lakeside | £4.14 |
| 7 | Tebworth Park | £4.13 |
| Region | £/MWh |
|---|---|
| South Eastern | £7.8 |
| Eastern | £4.1 |
| Yorkshire | £3.9 |
| Midlands | £2.9 |