What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £6.21 |
| 2 | Exergy Solutions E00E | £5.35 |
| 3 | Lakeside | £4.03 |
| 4 | THURROCK STORAGE #3 | £3.96 |
| 5 | Ocker Hill | £3.21 |
| 6 | Statkraft Markets #01 | £3.20 |
| 7 | Pillswood 1 | £2.80 |
| Region | £/MWh |
|---|---|
| Yorkshire | £3.4 |
| Midlands | £3.2 |
| South Eastern | £2.6 |
| Northern | £2.0 |
| Eastern | £1.1 |