What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £29.62 |
| 2 | Immingham CHP | £20.23 |
| 3 | BMUid for Sutton Bridge | £17.29 |
| 4 | Lakeside | £17.04 |
| 5 | Swangate | £15.61 |
| 6 | BGI Trading #1 | £15.53 |
| 7 | Ocker Hill | £15.34 |
| Region | £/MWh |
|---|---|
| South Eastern | £29.6 |
| Yorkshire | £15.8 |
| North Western | £15.4 |
| Midlands | £15.3 |
| Southern | £15.3 |