What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 45 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £13.83 |
| 2 | ClayTye Farm 1 | £13.58 |
| 3 | Lakeside | £11.95 |
| 4 | Statkraft Markets #07 | £11.72 |
| 5 | Ocker Hill | £11.37 |
| 6 | Spalding | £11.15 |
| 7 | Tebworth Park | £11.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.7 |
| Midlands | £11.4 |
| South Eastern | £11.2 |
| Eastern | £9.9 |
| North Western | £9.9 |